Ravi Srinivasan
2019-03-25 96d171175638b13537310ace4fc2a9e6145654d8
facilitation/01-kick-off-and-target-outcomes/README.md
@@ -24,4 +24,5 @@
* Play the [Collaborative Face Drawaing](http://www.funretrospectives.com/collaborative-face-drawing/) energizer
* Present slides which sign posts to all the introductions to make
* Showcase of the room to point to the visual artefacts to be used as a part of running the session (sign posted in slides)
* When introducing the Backlog for the 4 days, it's important to note that we almost certainly will not do everything on the backlog. We will also embrace feedback and change and may well add, remove, update, re-order the items on it. This is an important lesson that Backlogs never get done completely!
* Round the room for everyone to introduce themselve