donal
2018-05-29 e5b2d2504e43a741186c4a1491a5a3ecb365e800
commit | author | age
949294 1 # Setting up the Enablement Session
TB 2
2528a0 3 > These notes are intended to evolve into a set of shared thoughts on how to set up and facilitate the Open Innovation Labs DevOps Culture and Practice Enablement.
949294 4
TB 5 _____
6
7
8 ## Booking the space and facilities
9
10 Key requirements for the venue include:
11
12 * Desks in workshop format (5 tables of 4-5 people), ideally on wheels and movable (so we can go through the experience of teams configuring the space)
13 * Power socket banks for each table 
14 * LOTS of wall space (more than you could think.... we may need to supplement with "portable wall" boards) 
15 * Projector that supports HDMI
16 * Ability to play sound from laptop
943e9f 17 * Strong WiFi (all delegates will need to be connected throughout the Enablement)
949294 18 * At least one break out area - ideally a small room near the main room
e5b2d2 19 * Pair programming - Monitors for the tables. One between two attendees (or mobs up to three).
949294 20
TB 21
22 ## Shopping / Bring List
23
24 * Print Exercise Booklets - a PDF of all exercises. We have printed these in A4 color, double-sided with wire binding, a clear cover and black card back
25 * Card printouts of "The Big Picture" components
26 * Poster printouts of
27     * Henrik Kniberg Product Ownership in a Nutshell
28     * Henrik Kniberg Skateboard Picture
29     * The Agile Manifesto Values and Principles
30     * What DevOps is Not
e5b2d2 31     * The Agile Principles cartoon from Knowledge Train
2528a0 32 * Some spare adapters for overseas' participants to connect laptops to power    
949294 33 * Bluetac
TB 34 * A1 Sticky Chart Paper
35 * Boards (especially if wall space is lacking)
36 * Post-it / sticky notes (variety of colors and sizes as described in the Facilitation Guides)
37 * Sharpies (enough for one per participant + a few extra)
38 * Whiteboard Pens - mixture of colors
39 * Magic Whiteboard (especially if there is a lack of whiteboard space in the venue)
40 * Painters' Tape - mixture of colors
41 * Bluetooth Speaker
42 * Fun activities (e.g. a mini golf set and mini ping pong set)
43 * Option to project build monitors (e.g. through Rasperry Pis) - organise extra monitors or bring projector
44 * Think about capturing the Enablement by bringing, for example, GoPro Camera, 360 cameera, etc.
e5b2d2 45 * Monitors for pairing if not provided by the venue
D 46 * Download all videos used in the training incase of WiFi connectivity issues 
949294 47
TB 48
49 ## Setting up the Room
50
51 The day before the Enablement begins, get access to the room and lay out all materials. Specific things to set up include:
52 * Backlog
53 * Burndown
54 * Definition of Done
55 * Target Outcomes
56 * Realtime Retrospective
57 * Big Picture Area
58 * Practice Corner Area
59 * Ping Pong and Golf
60 * Labs is….
61 * Space for Faces
62 * Space for Animals
63
64 Think about the wall space that will be used for:
65 * Team's Social Contract
66 * Wider Group Social Contract
67 * Event Storming
68 * Metric Based Process Maps
69 * Value Slicing
70 * End of Day Retros
e5b2d2 71 * Pairing and mob faces
D 72 * Andon Chord or Real Bell / Buzzer if available
949294 73
TB 74
75 ## Facilitation Guidelines
76
77 * Facilitation Guides have been prepared for each of the exercises (technical and non-technical). These are intended to be living and breathing documents which will be updated as more Enablement sessions are run.
78 * Slideware includes lots of real world residency examples of practices being taught. It is expected that these examples will change session-by-session and the Labs facilitators will inject their own stories, photos and videos in here.
a5a0b4 79 * Catering is an important factor to consider. Having group breakfasts and lunch emulates what we do on Residencies
TB 80 * Having a group social during the week is also an important aspect of the Enablement